SolutionsQuality management

Quality management

Defects caught, held back and resolved to the end

Inspection templates with tolerances, incoming checks from GRNs and work orders, holds on failure, and NCRs with root cause and verified corrective action.

Defects caught, held back and resolved to the end

Key outcomes

  • Pass or fail by tolerance, not opinion
  • Failed goods held before anyone uses them
  • Every NCR has an owner, due date and evidence

Problems solved

  • Everyone inspects differently — Results are written on paper or in Excel, each inspector in their own way. The same lot passes for one person and fails for another, and nobody can check afterwards.
  • Defective goods still reach stock and production — Inspection sheets are separate from goods receipts. Uninspected or failed goods still get issued because nothing stops them.
  • Defects found, then forgotten — Issues are reported over chat with no owner and no deadline. Root causes are never recorded, so the same defect returns in the next lot.

How it works

  1. Standardize templates
  2. Inspect receipts from GRN
  3. Inspect in production
  4. Two-step result entry
  5. Approve and hold
  6. Handle non-conformance
  7. Track pass rate

This is a summary. The full content, step screenshots and FAQ are on the original page.

Related operations guide: Quality management