Production manager
See the shop floor every morning, assign the right people, measure OEE
Shop overview, capacity-based scheduling, crews and skills, shop-floor screens, downtime, rework and OEE — built on documents people report.
Key outcomes
- Late orders, shortages, overloads visible each morning
- Operations assigned to skilled people
- OEE and downtime causes backed by data
Problems solved
- No view of the floor in the morning — Which orders are late, which work center is overloaded and which machine is down is only known after walking the floor or calling each team lead.
- Hand-built schedules, double-booked machines — Spreadsheet plans ignore working calendars and parallel machines, so two orders land on the same work center and others run late.
- Work given to under-skilled operators — Team leads assign operations from memory. Operators without the required skill still run machines, defects rise and nobody can trace why.
- Downtime and rework go unrecorded — How long machines stop, why, and how much must be reworked has no data, so OEE cannot be computed and improvement targets are guesses.
How it works
- Morning shop overview
- Capacity and scheduling
- Crews and skills
- Shop-floor screen
- Downtime and rework
- OEE and improvement
This is a summary. The full content, step screenshots and FAQ are on the original page.
Related operations guide: Production manager