Business AppsCRMPipeline stages are configuration, not code

Pipeline stages are configuration, not code

Lead and deal stages are data you own, edited in Settings → CRM Stages. Each stage carries a name (in both languages), a default probability, and three flags: closed-won, closed-lost, and whether backward moves or skipping are allowed.

The shipped defaults are:

PipelineStages
LeadNew (10%) · Contacted (15%) · Qualified (25%) · Converted (100%, won) · Lost · Disqualified
DealQualified (25%) · Negotiation (50%) · Proposal (75%) · Closed won (100%) · Closed lost
RenewalIdentified (10%) · Engaged (35%) · Negotiating (70%) · Renewed (100%) · Churned

Probability drives the forecast, so editing a stage’s probability re-weights every open record sitting in it. Change stage probabilities deliberately, and ideally between forecast cycles rather than in the middle of one.

When to use it

  • When your sales process differs from the default stage set and you want to rename, add, or remove stages.
  • When you need to change probabilities so the forecast reflects how deals actually close.
  • When you want to control stage movement (allow backward moves or skipping).

Steps

Open the stage list

Go to Settings → CRM Stages and choose the pipeline to edit: lead, deal, or renewal.

Edit name and probability

Enter the name in both languages and set the default probability for the stage.

Set the stage flags

Mark the stage as closed-won or closed-lost where appropriate, and choose whether backward moves or skipping are allowed through this stage.

Check the forecast

After saving, open the forecast report to confirm that the weights of open records were re-computed as expected.

Notes

Editing a stage probability re-weights every open record sitting in that stage. Do it between forecast cycles.

Renewal stages are configured once here; the Customer Success app shares this catalog and has no stage catalog of its own. The toggles business.stage_criteria_enabled and business.stage_direction_control (on by default) control the stage criteria gate and backward-move control.